05:33 PM Miscellaneous Activities 1.50 hour (Project: Miscellaneous Activities)
Attend meeting called by Jignesh, for Testing Workflow Presentation. Amit Khobragade
05:03 PM UAT (User Acceptance Testing) 2.00 hours (Task #1768 (Closed): Hardware testing of Hex HD.)
Jignesh Parvatia
05:00 PM UAT (User Acceptance Testing) 2.00 hours (Task #1768 (Closed): Hardware testing of Hex HD.)
Meeting with development & testing Team Pradnya Shetty
04:55 PM UAT (User Acceptance Testing) 6.00 hours (Task #1768 (Closed): Hardware testing of Hex HD.)
Hardware Testing of HexHD Pradnya Shetty
04:53 PM Miscellaneous Activities 1.00 hour (Task #1774 (Closed): Meeting related to testing team allocation and process to follow.)
Attended meeting related to testing team allocation and process to follow related Unit testing and User acceptance te... Debashis Bhandari
04:52 PM Products Management 2.00 hours (Administration #1757 (In Progress): Administrative activities)
Mails and other coordination with other teams Uttam Kamkar
01:28 PM Products Management 2.00 hours (Administration #1757 (In Progress): Administrative activities)
Testing structure presented by AP, meeting with testing team Uttam Kamkar
01:19 PM Products Management 0.75 hour (Administration #1757 (In Progress): Administrative activities)
Updated Redmine Uttam Kamkar
04:49 PM Miscellaneous Activities 1.50 hour (Project: Miscellaneous Activities)
Attended Meeting related to testing workflow process. Nilima Chaudhari
04:07 PM Miscellaneous Activities 1.50 hour (Task #1512 (Closed): Testing team building)
Attended meeting called by Jignesh Avinash Pandey
01:29 PM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Discussed with PG and Swapnil for REC joining in MP4 Uttam Kamkar
01:23 PM Products Management 0.50 hour (Task #1758 (Rejected): Preparation for Bangalore exhibition June 2017)
Meeting with CMD for south exhibition activities Uttam Kamkar
01:20 PM Miscellaneous Activities 1.00 hour (Project: Miscellaneous Activities)
Attend Testing team workflow related meeting Parag Gandhi

07 Jun 2017

05:45 PM Miscellaneous Activities 2.00 hours (Task #1512 (Closed): Testing team building)
Worked on the task Avinash Pandey
05:34 PM Redmine Support 2.50 hours (Feature #1033 (Closed): Review and Implement Test Management System.)
Attend meeting for discussions on Test Plan,Management and Implementation in Redmine. Amit Khobragade
05:27 PM Redmine Support 2.50 hours (Feature #1033 (Closed): Review and Implement Test Management System.)
Implementing Plan. Amit Khobragade
04:53 PM Miscellaneous Activities 0.50 hour (Task #1472 (In Progress): Meeting with CMD.)
Meeting with CMD for HD recording in LSD4 model. Debashis Bhandari
04:48 PM Miscellaneous Activities 1.00 hour (Project: Miscellaneous Activities)
Understanding Audio input and output and also having discussion about build managment. Nilima Chaudhari
10:26 AM Products Management 1.00 hour (Administration #1757 (In Progress): Administrative activities)
Checked Switch ME sticker with vendor Uttam Kamkar
10:20 AM Products Management 1.00 hour (Administration #1757 (In Progress): Administrative activities)
Mails and other coordination with other teams Uttam Kamkar
10:17 AM Products Management 6.00 hours (Administration #1757 (In Progress): Administrative activities)
Updated Redmine with team tasks Uttam Kamkar

06 Jun 2017

06:01 PM Miscellaneous Activities 1.00 hour (Task #1512 (Closed): Testing team building)
Discussed about activity Avinash Pandey
05:53 PM Miscellaneous Activities 3.00 hours (Task #1467 (In Progress): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Meeting with Rahul Deshmukh Avinash Pandey
04:56 PM Miscellaneous Activities 4.00 hours (Project: Miscellaneous Activities)
Understanding and modifined Hex HD test checklist and explaind it to Shashank with help of Debashish Sir. Nilima Chaudhari

05 Jun 2017

08:38 PM Miscellaneous Activities 0.50 hour (Project: Miscellaneous Activities)
Redmine related activities, discussions w/Viren sir, Help to Uttam Amit Khobragade
05:38 PM Miscellaneous Activities 0.50 hour (Task #1467 (In Progress): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Meeting with CMD on developers task review Avinash Pandey
10:16 AM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
.Review of current task and predefined tasks.. RnD for new functions related to mfc. Bhagyashree Raut

03 Jun 2017

07:53 PM Miscellaneous Activities 4.00 hours (Project: Miscellaneous Activities)
As discussed by Virenbhai, help in Redmine to find Tasks, and Reviews of team members. Amit Khobragade
05:24 PM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
Done R n D of directX11 and attended reviews meeting. Snehal Patil
05:05 PM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
Miscellaneous Work & Review Gourisankar Samal

02 Jun 2017

06:20 PM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
trying to Fix D3DX11effect.h error from DX11 branch. Trrying to search specific dxsdk. Snehal Patil
04:54 PM Miscellaneous Activities 0.50 hour (Task #1472 (In Progress): Meeting with CMD.)
Meeting with CMD related saturday reviews, and new filter implementation in Octa 4K H/W. Debashis Bhandari

01 Jun 2017

05:53 PM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
Fixed compiled time error from DX11 branch. Done required setting. Solve merging error. Build sloution. Snehal Patil
05:11 PM Miscellaneous Activities 1.00 hour (Administration #1387 (Closed): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Parag Gandhi
05:05 PM Miscellaneous Activities 2.00 hours (Project: Miscellaneous Activities)
Meeting Called by Viren Satra, for Appraisals Amit Khobragade
04:13 PM Miscellaneous Activities 1.00 hour (Task #1467 (In Progress): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Discussion with Viren Sir on annual appraisal Avinash Pandey

31 May 2017

05:09 PM Miscellaneous Activities 4.00 hours (Project: Miscellaneous Activities)
Trying to fix error from DX11 branch with team member. Snehal Patil
05:03 PM Miscellaneous Activities 7.00 hours (Project: Miscellaneous Activities)
system Configuring for Amazeme with windows 10 Krishnam Raju
04:46 PM Miscellaneous Activities 1.00 hour (Task #1391 (In Progress): Meeting with Mr. Rahul Deshmukh)
Meeting with Mr. Rahul Deshmukh related to peers increment process. Debashis Bhandari
02:39 PM Miscellaneous Activities 0.75 hour (Project: Miscellaneous Activities)
Meeting with Rahul Deshmukh, and carrying activity for finding scales of listed developers for Increment calculations. Amit Khobragade
02:05 PM Miscellaneous Activities 1.00 hour (Task #1467 (In Progress): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Discussion with Rahul Sir on annual appraisal Avinash Pandey
09:01 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting Uttam Kamkar
08:46 AM Miscellaneous Activities 1.50 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Checked audio problem with Effexx Uttam Kamkar

30 May 2017

05:44 PM Miscellaneous Activities 3.00 hours (Task #1467 (In Progress): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Discussion with Rahul Sir on annual appraisal Avinash Pandey
05:19 PM Miscellaneous Activities 2.50 hours (Administration #1387 (Closed): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Parag Gandhi
04:56 PM Miscellaneous Activities 6.00 hours (Project: Miscellaneous Activities)
Under Standing the working of the composition Dialog Krishnam Raju
04:52 PM Miscellaneous Activities 4.00 hours (Task #1391 (In Progress): Meeting with Mr. Rahul Deshmukh)
Meeting with Mr. Rahul Deshmukh regarding Increment process of self and peers. Debashis Bhandari
04:48 PM Miscellaneous Activities 1.00 hour (Task #1678 (Closed): Testing Octa 4K H/W with THD application.)
Testing and reviewing Octa 4K H/w along with Amit and Uttam. Checking Audio and Video input output. Debashis Bhandari
04:41 PM Miscellaneous Activities 3.00 hours (Project: Miscellaneous Activities)
Resolved Exception in bin tab on right/double button click on timeline clip because of "SelectAudioTrack" menu. Commi... Snehal Patil
02:21 PM Miscellaneous Activities 0.50 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with Premlata, PG,RG Uttam Kamkar
02:21 PM Miscellaneous Activities 1.50 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Updated Redmine of the team Uttam Kamkar
02:20 PM Miscellaneous Activities 6.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Virtual set references Uttam Kamkar
02:20 PM Miscellaneous Activities 3.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
References to Himanshu Uttam Kamkar
02:20 PM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
02:20 PM Miscellaneous Activities 3.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Travel from Ahmedabad to Mum Uttam Kamkar
02:19 PM Miscellaneous Activities 12.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Visit to ETV Ahmedabad for election discussion and understanding requirements Uttam Kamkar
02:14 PM Miscellaneous Activities 2.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Travelled to Ahmedabad Uttam Kamkar
02:14 PM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Preparation for Ahmedabad visit Uttam Kamkar
02:12 PM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Updated redmine Uttam Kamkar

29 May 2017

05:36 PM Miscellaneous Activities 1.50 hour (Task #1672 (Closed): Interview for Software Developer.)
Taken interview of Sneha Medhekar Tiwari. Vinod Bholla
05:36 PM Miscellaneous Activities 1.50 hour (Task #1672 (Closed): Interview for Software Developer.)
Interview of Sneha for Jr. S/W Engineer Avinash Pandey
05:20 PM Miscellaneous Activities 1.50 hour (Task #1672 (Closed): Interview for Software Developer.)
Taken 2nd round of interview of Sneha Medhekar Tiwari with ASvinash Pandey Parag Gandhi
04:14 PM Miscellaneous Activities 1.50 hour (Task #1672 (Closed): Interview for Software Developer.)
Taken interview of Sneha Medhekar Tiwari. Debashis Bhandari
05:18 PM Miscellaneous Activities 4.00 hours (Project: Miscellaneous Activities)
Resolved Exception in bin tab on right button click because of "SelectAudioTrack" menu. and tested by team member f... Snehal Patil
04:58 PM Miscellaneous Activities 6.00 hours (Project: Miscellaneous Activities)
Understanding how the composition works in Amazeme project Krishnam Raju

26 May 2017

05:35 PM Miscellaneous Activities 4.00 hours (Project: Miscellaneous Activities)
Prepared setup of 8.0.0 from trunk . Tested setup on tester machine and share with tester. Snehal Patil

25 May 2017

04:31 PM Miscellaneous Activities 8.50 hours (Task #1664 (Closed): Application of Octa 4K not running on Octa 4K H/W.)
Communicated with Marcin related to Current application not running on Octa 4K H/W. After debugging it is found that ... Debashis Bhandari

24 May 2017

11:01 PM Miscellaneous Activities 1.00 hour (Project: Miscellaneous Activities)
Meeting with Virenbhai. Amit Khobragade
04:29 PM Miscellaneous Activities 2.00 hours (Task #1472 (In Progress): Meeting with CMD.)
Meeting with CMD related to Bolt HD project release dates, existing projects maintenance, new resource recruitment, i... Debashis Bhandari
04:02 PM Miscellaneous Activities 1.00 hour (Task #1472 (In Progress): Meeting with CMD.)
Meeting with CMD related to current task update and Bolt HD Project and redmine update. Debashis Bhandari
03:44 PM Miscellaneous Activities 6.00 hours (Task #1657 (Closed): Discuss and finalize product road map of 2017-2018)
Discuss and finalize product roa map of 2017-2018 with Uttam, Debashis, Rohit, Avinash and Jignesh Uttam list down al... Debashis Bhandari
09:05 AM Miscellaneous Activities 7.50 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with development team for product roadmap Uttam Kamkar
09:04 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
09:02 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
09:01 AM Miscellaneous Activities 0.50 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
09:01 AM Miscellaneous Activities 2.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with CMD for increment Uttam Kamkar
08:58 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
08:58 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Coordination with teams Uttam Kamkar
08:57 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Animation objects with SJ Uttam Kamkar
08:56 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with development team for increment and incentive plan Uttam Kamkar
08:56 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
8 input composition discussion and creation Uttam Kamkar
08:55 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
08:55 AM Miscellaneous Activities 3.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Checked 3D texture garbage for 8 input composition Uttam Kamkar
08:54 AM Miscellaneous Activities 6.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with RD for increment and 2 sat working Uttam Kamkar
08:53 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
08:30 AM Miscellaneous Activities 1.50 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
08:15 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
08:15 AM Miscellaneous Activities 2.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with CMD Uttam Kamkar
08:14 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar
08:12 AM Miscellaneous Activities 2.00 hours (Task #905 (In Progress): Activities for Uttam Kamkar)
Meeting with development team for product roadmap Uttam Kamkar
08:10 AM Miscellaneous Activities 1.00 hour (Task #905 (In Progress): Activities for Uttam Kamkar)
Mails and other coordination with other teams Uttam Kamkar

23 May 2017

05:52 PM Miscellaneous Activities 5.00 hours (Task #1655 (Closed): Discuss and finalize product road map of 2017-2018)
Parag Gandhi

19 May 2017

05:06 PM Miscellaneous Activities 4.00 hours (Task #1633 (Closed): Meeting with Mr. Hebiz related development of new H/W.)
Parag Gandhi
04:54 PM Miscellaneous Activities 4.00 hours (Task #1632 (Closed): Meeting with Mr. Hebiz related to Octa4K H/W.)
Discussed regarding new requirements, Firmware, H/W modification. Debashis Bhandari

18 May 2017

06:03 PM Miscellaneous Activities 1.00 hour (Project: Miscellaneous Activities)
Discuss webstreaming in Twisterhd on Youtube using third party application with Mehulbhai Parag Gandhi
05:55 PM Miscellaneous Activities 1.00 hour (Task #1512 (Closed): Testing team building)
Discussion with jignesh Avinash Pandey
05:17 PM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
1. Reviewing 7.6 security related code bacause of customer issue. 2. Audio Movesegment issue : Debugging, analysing ... Snehal Patil

17 May 2017

05:48 PM Miscellaneous Activities 3.00 hours (Project: Miscellaneous Activities)
Discuss apprisal, next year project prioity, milstone with Viren sir, Uttam , Rohit, Avinash Parag Gandhi
04:31 PM Miscellaneous Activities 1.00 hour (Task #1525 (Closed): Meeting with CMD)
Meeting with CMD on annual review Avinash Pandey

12 May 2017

09:19 PM Redmine Support 3.00 hours (Feature #1605 (Rejected): Implement KPI plugin in Redmine.)
Re-Reading and Implementing from example given on RM+ site. Amit Khobragade
06:40 PM Miscellaneous Activities 5.00 hours (Administration #1387 (Closed): Meeting with Mr. Rahul Deshmukh and Viren Sir)
Parag Gandhi
06:25 PM Miscellaneous Activities 2.00 hours (Task #1391 (In Progress): Meeting with Mr. Rahul Deshmukh)
Meeting with Mr. Rahul Deshmukh regarding Increment process. Debashis Bhandari

11 May 2017

05:55 PM Redmine Support 4.50 hours (Feature #1605 (Rejected): Implement KPI plugin in Redmine.)
Reading Docs. Amit Khobragade
05:42 PM Miscellaneous Activities 8.00 hours (Project: Miscellaneous Activities)
Requirement of replacing traget size combo box with edit box in MPEG, MPEG4, H264 format of Export to file dialog . Snehal Patil
05:38 PM Miscellaneous Activities 2.50 hours (Task #1610 (Closed): Attended GSuite training session.)
Parag Gandhi
04:57 PM Miscellaneous Activities 2.00 hours (Task #1609 (Closed): Attended GSuite training session.)
Attended G Suite training session. Debashis Bhandari

10 May 2017

05:50 PM Miscellaneous Activities 2.00 hours (Project: Miscellaneous Activities)
Discuss Appraisal process with Uttam, Rohit Parag Gandhi
05:30 PM Redmine Support 2.00 hours (Feature #1605 (Rejected): Implement KPI plugin in Redmine.)
Looking for Docs for Plugin usage. Amit Khobragade
05:28 PM Redmine Support 4.00 hours (Feature #1605 (Rejected): Implement KPI plugin in Redmine.)
Looking to have unlimited access. Amit Khobragade
05:13 PM Miscellaneous Activities 3.00 hours (Project: Miscellaneous Activities)
Reviews of audio patch made by Gourishankar . Applying patch on trunk ( software machine ). Snehal Patil
 